Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
scada in electrical engineering | 0.75 | 0.2 | 3009 | 22 | 31 |
scada | 0.37 | 0.1 | 3914 | 46 | 5 |
in | 0.34 | 0.6 | 9995 | 33 | 2 |
electrical | 0.92 | 0.9 | 5049 | 37 | 10 |
engineering | 0.42 | 0.3 | 3732 | 88 | 11 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
scada in electrical engineering | 1.49 | 0.2 | 5486 | 45 |
what is plc scada in electrical engineering | 0.16 | 0.1 | 9435 | 90 |
scada system in electrical engineering | 1.05 | 0.9 | 702 | 27 |
scada meaning in electrical | 0.78 | 0.4 | 9578 | 82 |
what does scada stand for in engineering | 0.05 | 0.6 | 4000 | 57 |
scada in power system | 0.86 | 0.3 | 3264 | 59 |
scada full form in electrical | 1.44 | 0.4 | 841 | 83 |
scada projects for engineering students | 0.04 | 0.7 | 9840 | 32 |
what is a scada engineer | 0.33 | 0.1 | 3343 | 86 |
scada used in power industry | 0.55 | 0.2 | 5158 | 62 |
scada system in power system | 1.81 | 0.1 | 5599 | 64 |
scada in power projects | 0.83 | 0.6 | 6923 | 80 |
what is an scada | 0.88 | 0.5 | 847 | 87 |
what are scada systems | 1.65 | 0.3 | 619 | 61 |
electric utility scada system | 1.35 | 0.9 | 5357 | 96 |
explain what is scada | 1.14 | 0.6 | 8415 | 49 |