Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
minneapolis garbage and recycling schedule | 0.4 | 0.3 | 3541 | 31 | 42 |
minneapolis | 1.66 | 0.4 | 1271 | 44 | 11 |
garbage | 1.93 | 0.4 | 6648 | 19 | 7 |
and | 0.84 | 0.8 | 7697 | 95 | 3 |
recycling | 1.85 | 0.7 | 9502 | 52 | 9 |
schedule | 0.65 | 0.4 | 9789 | 69 | 8 |